PENGGUNAAN METODE RCFA UNTUK MEMPERBAIKI KERUSAKAN SISTEM KELISTRIKAN MOTOR UTAMA MESIN FRAIS ACIERA F3

Authors

  • Mustaqim Mustaqim Politeknik Manufaktur Negeri Bangka Belitung
  • Septiarditian Septiarditian Politeknik Manufaktur Negeri Bangka Belitung
  • Indra Feriadi Politeknik Manufaktur Negeri Bangka Belitung
  • Muhammad Rivai Politeknik Manufaktur Negeri Bangka Belitung
  • Fajar Aswin Politeknik Manufaktur Negeri Bangka Belitung

Keywords:

RCFA, 5 Why, contactor, electrical system, milling machine, preventive maintenance

Abstract

Damage to the electrical system of the Aciera F3 milling machine caused the main motor to fail to operate, disrupting practical activities at the Bangka Belitung State Manufacturing Polytechnic. This study aims to identify the root cause of the failure and carry out repairs using the Root Cause Failure Analysis (RCFA) approach with the 5 Why technique. The research stages include data collection through technician interviews, visual inspections, and functional testing of the electrical system. The analysis revealed that the damage resulted from a short circuit in the C2 contactor, caused by component aging and the absence of routine inspections. Corrective action was taken by replacing the damaged contactor and auxiliary contact components. As a preventive measure, an electrical inspection checklist was developed to support scheduled maintenance. Post-repair testing showed that the electrical system functioned normally and the machine could operate according to standard specifications. The application of the RCFA method proved effective in resolving the problem comprehensively and laying the foundation for a reliability-based maintenance system.

Downloads

Download data is not yet available.

References

Akbar, R. M., & Widiasih, W. (2022). Analisis Perawatan Mesin Bubut Dengan Metode Preventive Maintenance Guna Menghindari Kerusakan Secara Mendadak dan untuk Menghitung Biaya Perawatan.

Deradjad Pranowo, I. (2019). Sistem dan Manajemen Pemeliharaan.

Dio, E., & Rudiansyah. (2022). Rekondisi Mesin Frais Aciera F3 No. FR05 di Laboratorium Pemesinan Dasar Politeknik Manufaktur Negeri Bangka Belitung.

Feriadi, I. (2017). Modul Perawatan Korektif.

Hidayah, N. Y., & Ahmadi, N. (2017). Analisis Pemeliharaan Mesin Blowmould Dengan Metode RCM Di PT. CCAI. Jurnal Optimasi Sistem Industri, 16(2), 167. https://doi.org/10.25077/josi.v16.n2.p167-176.2017

Munthe, S., Utama, D. W., & Pane, I. (2009). Implementasi Manajemen dan Teknik Pemeliharaan Pada PT Garuda Mas Perkasa (Vol. 3, Issue 1).

Rahman, H. K. (2021). Analisis Kerusakan After-Cooler di LNGC. Tangguh Jaya dalam Voyage 18/TJ/08.

Downloads

Published

22-08-2025

How to Cite

Mustaqim, M., Septiarditian, S., Feriadi, I., Rivai, M., & Aswin, F. (2025). PENGGUNAAN METODE RCFA UNTUK MEMPERBAIKI KERUSAKAN SISTEM KELISTRIKAN MOTOR UTAMA MESIN FRAIS ACIERA F3. Prosiding Seminar Nasional Inovasi Teknologi Terapan, 5(1), 116–122. Retrieved from https://snitt.polman-babel.ac.id/index.php/snitt/article/view/632

Most read articles by the same author(s)

1 2 3 4 > >>