The hydraulic system is a critical component of the Tin Production Suction Dredge (KIP), responsible for powering various operational equipment. Failures in this system can disrupt production, increase downtime, and raise maintenance costs. This study aims to identify the types of failures in the hydraulic system of KIP Timah 07, analyze their causes and impacts using the Failure Mode and Effect Analysis (FMEA) method, and establish maintenance priorities based on Risk Priority Number (RPN) values. A descriptive-quantitative research method was employed, with data collected through observation, interviews, and documentation of failure records from 2025. The analysis involved identifying failure modes, determining Severity (S), Occurrence (O), and Detection (D) ratings, and calculating the RPN for each failure mode. The results indicate 29 failure incidents totaling 320.5 hours of downtime. The component most frequently experiencing failure was the Staffa cutter hose, followed by the cutter hydraulic pump, cutter hydraulic flange, and hose nipples. Primary causes of failure included component wear, high operating pressure, connection leaks, and suboptimal inspections. Applying the FMEA method enabled the identification of risk priorities, serving as a basis for developing a more effective preventive maintenance program. Implementing the maintenance recommendations is expected to enhance hydraulic system reliability, reduce failure frequency, minimize downtime, and improve the operational efficiency of the Tin Production Suction Dredge.

Downloads

Download data is not yet available.

References

Irzon.R, “PENAMBANGAN TIMAH DI INDONESIA: SEJARAH, MASA KINI, DAN PROSPEKSI,” Jurnal Teknologi Mineral dan Batu Bara, 2021.

P. T. (. Tbk, Menyempurnakan Arah dan Kapabilitas Untuk Berkembang Lebih Jauh Refining Progress And Capabilities To Rise Ahead, PangkalPinang: Annual Report 2025, 2025.

F. H. Aziz.A.P, “Measuring the reliability of hydraulic production equipment for tin suction vessels using the OEE and MTBS methods,” Jurnal Terapan Teknik Mesin, 7, 1, pp. 146-156, 2026.

F. E. Fadhilsyah.I, “Pengukuran Keandalan Alat Keruk Kapal Isap Produksi Timah 7 Menggunakan Pendekatan Overall Equipment Effectiveness (OEE),” Jurnal Teknologi Politeknik Negeri Lhokseumawe, 26, 1, 2026.

Andre, “Analysis of the occurrence of hydraulic oil leakage in the steering gear on the AHT Iron Tug ship,” JURNAL KARYA ILMIAH TARUNA ANDROMEDA, 10, 1, 2026.

P. P. A. C. Braga.L, “Increased Availability Risk-Based Maintenance ROV's Hydraulic System,” Journal of ETA MARITIME SCIENCE, 12, 3, pp. 310-318, 2024.

F. H. Fadhillah.F.V, “Sistem Prediktif Pemeliharaan Hidraulik dengan Pendekatan Algoritma Histogram Gradient Boosting,” Jurnal Sistem Informasi dan Informatika, 5, 1, 2026.

A. MUHDOR.A.I.S, “Analisis Kerusakan Sistem Hidrolik Pada Excavator dengan Menggunakan Metode FMEA,” Jurnal Cendikia Mekanika, 6, 2, 2025.

Indrawan.S, “Penerapan Metode FMEA untuk Mengidentifikasi Pemborosan: Literatur Review,” Engineering and Technology International Journal, 6, 2, 2024.

N. K. A. Panyukov.D.I, “Improvement of the Risk Assessment System Based on the FMEA Action Priority Method,” Russian Engineering Research, 44, pp. 1030-1034, 2024.

Downloads

Published

21-08-2026

How to Cite

Ferdi, F., Aswin, F. ., & Riva’i, M. . (2026). PENERAPAN METODE FMEA PADA PERAWATAN SISTEM HIDROLIK KAPAL ISAP PRODUKSI TIMAH. Prosiding Seminar Nasional Inovasi Teknologi Terapan, 6(1), 399–405. Retrieved from https://snitt.polman-babel.ac.id/index.php/snitt/article/view/836

Most read articles by the same author(s)

1 2 > >>